Files

Download

Download Primary File (419 KB)

Download Build it Fast! - Student Handout.docx (66 KB)

Download Build it Fast!.pptx (1.2 MB)

Download Example Overpass, print single sided.pdf (79 KB)

Description

One of the costs of any road project is the economic impact of rerouting traffic during the construction. Methods that minimize the disruption will reduce costs and often improve safety. Accelerated Bridge Construction (ABC) methods include prefabricating as much of the bridge as possible at an off-site location. Large parts are brought to the site and installed according to a plan that minimizes the time required to reroute traffic.

Publication Date

2023

Disciplines

Curriculum and Instruction | Engineering | Science and Mathematics Education

Activity 3: Build it Fast!

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.